A reorder point calculator tells you the stock level at which to place your next supplier order, so new units arrive before the shelf runs empty. Enter how many units you sell per day, how long your supplier takes to deliver and how much buffer you want to keep, and you get one number to watch. The calculator below also checks that number against what you really have available, counting units already on order and units already promised to customers, because comparing it with shelf stock alone is how shops end up ordering twice or running out with a full stockroom.
Reorder point calculator
Safety stock20 units
Reorder point104 units
Inventory position (on hand + on order − committed)140 units
No order needed yet: your inventory position is still above the reorder point.
About 3 days of sales before you reach the reorder point.
Zero sales? Use a recent period with sales, or a fixed buffer for slow sellers.
Units on order only prevent a stockout if they arrive in time. A confirmed delivery due after your free stock runs out still leaves a gap, so check expected delivery dates as well as quantities.
The Z method assumes daily sales roughly follow a bell curve, with at least 8 to 12 weeks of data. It is less reliable for slow or irregular sellers.
This calculator is not connected to any account and does not place orders: deciding the reorder point, and when to order, stays with you. It assumes stable demand and continuous review — if you only check stock once a week, add that review period to the lead time. It tells you when to order, not how much. Run it per stock location, and remember the answer is only as good as your stock records.
See how Trapyfy keeps stock and supplier orders in one record
The calculator is a planning tool. It isn’t connected to any store account, and the result is only as good as the numbers you put in. The rest of this guide explains the formula, the three ways to set safety stock, and the situations where a simple reorder point gives the wrong answer.
How the reorder point formula works
The reorder point (ROP) is the inventory level that triggers a new purchase order. It equals the demand you expect during the supplier’s lead time plus a safety stock: ROP = average daily sales × lead time in days + safety stock.
The first part, demand during lead time, covers the sales you will make while the order is on its way. The second part, safety stock, covers what the average doesn’t: a busier week than usual, or a delivery that turns up late. Take a shop that sells 12 units of a product a day, works with a supplier that delivers in 7 days and keeps 20 units as a buffer:
- Demand during lead time: 12 × 7 = 84 units
- Safety stock: 20 units
- Reorder point: 84 + 20 = 104 units
When the stock available for that product falls to 104 units, the order goes out. If sales and lead time behave as expected, the delivery lands as you dip into the 20-unit buffer, not after you have sold out.
Use the same time unit everywhere. If you measure lead time in days, use sales per day; mixing weekly sales with a lead time in days gives a number that is off by a factor of seven. Work it out per product, and per variant when variants sell at different speeds. A medium T-shirt and an extra-large one rarely need the same reorder point.
Compare the reorder point with available stock, not shelf stock
The most common mistake isn’t the formula. It’s what you compare the result with. The number to check against your reorder point is your inventory position: the stock you have, plus what is already on its way, minus what is already promised to customers.
Inventory position = stock on hand + units on open purchase orders − units committed to customer orders not yet fulfilled.
Both corrections matter, and in opposite directions:
- Units on order stop you ordering twice. Say you have 90 units on the shelf and a purchase order for 60 more arriving in two days. Shelf stock alone (90) is below the reorder point of 104, so you would reorder. But your position is 150 once the open order is counted, so no new order is needed yet.
- Committed units stop you running out with a full stockroom. Say you have 115 units on the shelf, but 20 are already sold in orders waiting to be packed. On paper you are above 104; in practice only 95 are free to sell, so you should already be reordering.
Units on order should only count if they are genuinely coming: a purchase order the supplier has confirmed, not a draft you haven’t sent. Counting them doesn’t make them arrive sooner, though: if a confirmed delivery is due after your free stock runs out, you can still sell out in between, so check expected delivery dates as well as quantities. Once a delivery arrives, it moves from “on order” to “on hand” when it is counted and booked in. Count it in both places and you overstate your position. Our guide to the purchase order process covers that receiving step.
Where a simple reorder point stops being reliable
The reorder point formula assumes a few things. When they don’t hold, treat the result as a starting point and adjust it:
- It assumes you check stock continuously. If you only review stock once a week, demand keeps going between checks. Add the review period to the lead time (7 days of lead time + 7 days between checks = 14 days of demand), or you will find the reorder point already passed when you next look.
- It assumes demand is fairly steady. Launches, promotions, seasonal peaks and one-off bulk orders break the average. Plan those separately rather than letting them inflate everyday daily sales.
- It tells you when to order, not how much. The order should at least bring your position back above the reorder point with room to spare. Order quantity is a separate decision (see EOQ below), shaped by supplier minimums and case sizes.
- It works per stock location. If stock sits in two warehouses that sell independently, each needs its own reorder point.
- It depends on accurate stock records. If the system says 120 and the shelf holds 95, every calculation starts wrong. A regular inventory count keeps the starting number honest.
Three ways to set safety stock
Safety stock is the part of the reorder point you choose. Too little and you run out whenever reality beats the average; too much and cash sits on the shelf. The calculator supports three methods, from simplest to most data-hungry.
1. A fixed buffer you choose
You pick a number from experience: “we never want fewer than 20 left when the order goes out,” or a few days of sales. It’s quick and easy to explain, and fine for steady products with reliable suppliers. Its weakness is that it doesn’t react when sales or lead times change, so revisit it every few months.
2. The max–average method
Safety stock = (maximum daily sales × maximum lead time) − (average daily sales × average lead time). With a best day of 18 units and a slowest delivery of 10 days: (18 × 10) − (12 × 7) = 180 − 84 = 96 units of safety stock, which puts the reorder point at 84 + 96 = 180.
It needs only your sales history and supplier records, no statistics. The catch is that it plans for your best sales day and your worst delivery at the same time, which rarely happens, so it tends to overstate the buffer. One extreme day in your history can inflate it. Use your typical peak, not a one-off spike.
3. The service level (Z) method
Safety stock = Z × standard deviation of daily sales × √lead time. Z comes from the service level you want, meaning how often you accept running out before a delivery arrives:
| Service level | Z value | Roughly means |
|---|---|---|
| 90% | 1.28 | A stockout in about 1 of 10 replenishment cycles |
| 95% | 1.65 | About 1 in 20 |
| 97.5% | 1.96 | About 1 in 40 |
| 99% | 2.33 | About 1 in 100 |
With a standard deviation of 4 units a day, a 7-day lead time and a 95% target: 1.65 × 4 × √7 ≈ 17.5, rounded up to 18 units of safety stock, for a reorder point of 84 + 18 = 102.
If your supplier’s lead time also varies, the calculator can include it. Enter the standard deviation of lead time in days and it uses the combined formula: Z × √(lead time × σsales² + average daily sales² × σlead time²). With a lead time that varies by 2 days, the same example becomes 1.65 × √(7 × 16 + 144 × 4) ≈ 43.3, rounded up to 44 units, for a reorder point of 128. That jump shows how much an unreliable supplier costs in extra stock.
When the Z method is reliable, and when it isn’t
The Z method looks precise, but it rests on assumptions small shops often break:
- Demand roughly follows a bell curve. It suits products that sell most days in similar amounts. For slow or lumpy sellers, such as three units one week and none for a month, it underestimates the risk; a fixed buffer is usually more honest there.
- Days are independent and the pattern is stable. Strong weekly cycles, a trend or a seasonal peak inside your data distort the standard deviation. Calculate it from a comparable period, and plan peaks separately.
- You have enough history. A standard deviation from two weeks of sales is a guess. Aim for at least 8 to 12 weeks of daily data, and leave out stockout days: a day with zero sales because the shelf was empty isn’t a day with zero demand.
- The units match. Standard deviation per day goes with lead time in days. If you only have weekly figures, convert both to weeks.
- “Service level” here means cycle service level: the share of replenishment cycles without a stockout. It isn’t the share of customer orders you fill. A 95% cycle service level usually fills more than 95% of units, and the two are easy to confuse when you report them.
- Higher targets get expensive fast. Going from 95% to 99% raises Z from 1.65 to 2.33, about 40% more safety stock for the same product. Reserve the top levels for items where a stockout really costs you.

Keep stock and supplier orders in one record
Track stock by product, variant and warehouse, spot low and out-of-stock items in your inventory reports, and raise purchase orders to your suppliers from the same dashboard.
Reorder points when one stock pool feeds several channels
Most reorder point guides assume one shop and one shelf. Many small sellers now sell the same stock at the counter, on a self-service kiosk and through an online channel such as a Telegram shop. That changes two inputs.
Daily sales is the total of every channel that sells from that stock. If the counter sells 7 units a day, the kiosk 2 and the Telegram shop 3, average daily sales is 12, not the 7 your till shows. Work the reorder point out from one channel’s numbers and you will run out on all of them. Our guide to multichannel inventory management explains how a shared stock pool works.
Lead time depends on where the stock comes from. If a shop is topped up from your own warehouse rather than directly by the supplier, its lead time is the transfer time, which may be one or two days rather than the supplier’s seven. Each location then needs its own reorder point, and the warehouse needs one that covers what the shops pull from it. Stock moving between locations is covered in our guides to multi-warehouse inventory management and inventory transfers.
Committed units matter more with several channels, too. An online order taken at 9pm and packed the next morning is stock you no longer have, even though it is still on the shelf.
What happens if the reorder point is too high or too low
Both mistakes cost money; they just show up in different places.
| Reorder point is… | What you see | What it costs |
|---|---|---|
| Too high | Orders go out early; stock piles up; deliveries arrive while shelves are still full | Cash tied up in stock, storage space, more risk of damage, expiry or shrinkage, and markdowns on slow items |
| Too low | Shelves empty before deliveries arrive; rush orders; “back in stock soon” messages | Lost sales, customers buying elsewhere, express shipping costs, and staff time chasing suppliers |
If you keep running out, check the inputs before raising safety stock. Out-of-date daily sales, a supplier that has quietly got slower, or stock records that don’t match the shelf are more common causes than too small a buffer.
Reorder point and economic order quantity answer different questions
The reorder point tells you when to order. Economic order quantity (EOQ) estimates how much to order, balancing the cost of placing orders against the cost of holding stock: EOQ = √(2 × annual demand × cost per order ÷ annual holding cost per unit).
They work together: when your inventory position reaches the reorder point, you order roughly the EOQ. In small retail, supplier minimums, case sizes, volume discounts and shelf space often matter more than the textbook EOQ, so treat it as a sense check rather than a rule. If you sell wholesale as well, your margins shape how much stock is worth holding; see wholesale price vs retail price.
When to recalculate your reorder points
A reorder point is only as current as the numbers behind it. Recalculate when:
- Sales speed changes: a product takes off, slows down or moves into a new season. For peaks such as Black Friday, plan the extra stock separately; our Black Friday checklist covers the preparation.
- A supplier’s lead time changes, or you switch supplier.
- You add a sales channel or another location starts selling from the same stock.
- A stock count shows large differences between records and shelves.
- At a fixed rhythm otherwise: monthly for fast sellers, quarterly for the rest.
From reorder point to purchase order in Trapyfy
The calculator gives you the numbers; the work is keeping an eye on them and acting in time. In Trapyfy inventory control, stock is tracked per product and per variant, by warehouse, and the same stock record serves the register, the kiosk and the Telegram shop, according to each channel’s warehouse setup. Inventory reports flag low-stock and out-of-stock products, and the store assistant can answer “What should I restock?” based on your stock levels and recent sales.
When it is time to order, you raise a purchase order to the supplier from the same dashboard and follow its status while it is pending. When the delivery arrives and has been checked, completing the purchase order adds the received units to stock, so they don’t have to be typed in by hand.
Deciding the reorder point for each product, and the moment to raise the order, stays with you. The reorder point calculator above is the quickest way to set that number, and the accuracy of your stock records decides how well it works.

Restock with numbers you can trust
Sell through Telegram, the counter and a kiosk from one shared stock record, and turn checked supplier deliveries into stock by completing the purchase order.
Reorder point FAQ
How do you calculate a reorder point?
Multiply average daily sales by the supplier’s lead time in days, then add safety stock. A product that sells 12 units a day with a 7-day lead time and 20 units of safety stock has a reorder point of 12 × 7 + 20 = 104 units. Place the order when your inventory position (stock on hand plus units on order, minus units committed to customer orders) reaches that level.
Does the reorder point include safety stock?
Yes. The reorder point is demand during lead time plus safety stock. Without safety stock, you would run out whenever sales were above average or a delivery was late. If you choose zero safety stock, the reorder point equals demand during lead time.
What is the safety stock formula?
There are several. The simplest is a fixed buffer you choose. The max–average method is (maximum daily sales × maximum lead time) − (average daily sales × average lead time). The service level method is Z × standard deviation of daily sales × √lead time, where Z depends on the service level you want.
What is the Z value in the safety stock formula?
Z is a factor from the normal distribution that matches a target cycle service level: 1.28 for 90%, 1.65 for 95%, 1.96 for 97.5% and 2.33 for 99%. It assumes daily demand roughly follows a bell curve and that you have several weeks of reliable sales data. It is less reliable for slow, lumpy or seasonal products.
Should units already on order count towards the reorder point?
Yes. Compare the reorder point with your inventory position, not just shelf stock. Units on confirmed purchase orders count, because they will arrive; units already sold to customers but not yet shipped come off, because they are no longer free to sell. Ignoring open orders leads to ordering twice; ignoring committed units leads to stockouts.
What happens if the reorder point is too high?
You order earlier than needed, so stock and cash pile up. Excess stock takes space, ties up money and raises the risk of damage, expiry and markdowns. If the reorder point is too low, the opposite happens: shelves empty before the delivery arrives and sales are lost.
How is the reorder point different from economic order quantity?
The reorder point tells you when to place an order; economic order quantity (EOQ) estimates how many units to order, balancing ordering costs against holding costs. You place an order of roughly the EOQ when your inventory position reaches the reorder point, adjusted for supplier minimums and case sizes.
How often should I recalculate reorder points?
Recalculate whenever sales speed, supplier lead time or your sales channels change, and after a stock count that shows large differences. Otherwise, review fast-selling products monthly and the rest quarterly.
Order on time, without guessing
A good reorder point turns restocking from a gut feeling into a routine: one number per product, checked against stock you actually have, with a buffer sized to how unpredictable that product really is. Start with the reorder point calculator, use the simplest safety stock method your data supports, and revisit the numbers when sales or suppliers change. The shop that orders on time stops paying twice: once in lost sales when shelves run empty, and again in cash sitting in stock it ordered too early.
If you want one place to keep that stock record across Telegram, the counter and a kiosk, you can create your Trapyfy store and set up your products, warehouses and suppliers.